Seequartier – Train Station & Hotel, Bregenz (AT)

The 20,000 m² area of the existing railway station will give way for the so-called Seequartier, a trend-setting combination of apartments, offices, shops and public transport, connecting city center and suburb.
A new train station will form the heart of the Seequartier with a terminal for public transport. The ‘lake clasp’, an overpass to Lake Constance, will remain. The bus station is located between the planned high-rise, the train station and the L190. A new square is designed as a ‘shared place’ for buses and pedestrians alike.
The start of construction of the Seequartier (14,000 m² sales area, 2,000 m² office space and about 60 rental apartments on the top floors) as well as the Seequartier is yet to be decided.

Client: Rhomberg Bau, i+R Gruppe, ZIMA, Alpenländische Heimstätte, Wohnbauselbsthilfe
Location: A-6900 Bregenz, Bahnhofstraße
Architecture: Dietrich | Untertrifaller
Project management: Susanne Gaudl
Competition: 2011
Construction: 2017-2020
Area: ca. 19,300 m²
Capacity: 14,000 m² commercial area; 2,000 m² offices; 60 apartments; 1,000 underground parking places